SAP Landscape-Transport Request (TR) Process in SAP- All Modules:



SAP Landscape-Transport Request (TR) Process in SAP- All Modules

For Videos Explanation, please go to YouTube and Subscribe -  Studyuuu  SAPMM


Concept:

Landscape in other words we can call as Servers, and TR-Transport request- is whenever we make any changes to the configuration then system will pop-up a TR number.

TR number will be used to transfer the configuration from one client to another client- this will be within the server or outside server to server.

The below process is purely organisation dependent and it may vary from company to company.

Server:

 A server is a devise where set of programs has been installed to respond and save the queries into the database (Don’t worry if you don’t understand)

Client

Client is the base where it will be always located in the server- and any queries to the client we can run in the server program (Don’t worry if you don’t understand).

Note: One server may have N number of clients.

SAP Point of View explanation:

Here SAP, in any company we have 3 servers, the landscape concept it may vary from business to business and organisation to organisation.

But every company will have all these 3 servers to maintain the company standards.

We can have SPRO settings option in only Development server and remaining two servers will not show any SPRO settings.

Movement of one server to other server will be done by SAP Basis team, and ticket needs to be created by our side to move the data.

1.     Development server

1)Sand Box

2)Unit test

2.     Quality Check server

3.     Production Server

Here above mentioned we have 3 servers and 1st server contains 2 clients.

Client 1: Sand box- where sandbox will be used for testing and development purpose and before implementing in main server, the consultant needs to test in Sandbox and once the consultant believes that 100% accurate then he will be implementing in Unit test Client.

Important note: Whatever the implementation we are doing it’s a custom and original one is developed by SAP and it been hidden in the systems- we will be calling as Golden client.

Whenever something goes wrong then we can reset all things from this client.

Client 2: Unit test

Here in the above step, its sandbox and where we will test for samples and once we are succeeding there then we can input the same in unit test by transferring the ticket to unit test from Sand box—SCC1 can be used to move.

For this step, no need to release the TR, we can move within client without releasing and without Basis help.

Now once you moved to unit test, Use the same TR number for moving-which will be done by BASIS team.

2. Quality Check server-QAC

Now TR needs to be released to move from one client to other client with the help of BASIS tam and TR needs to be released with T-code SE01

TR number should be provided to BASIS team with raising a ticket or email-Depends on your organisation process, once the BASIS team checks and moves the configuration to QAS Server.
Basis team will transfer the TR from one serer to another server by using STMS.

Here the testing will be done by Superuser from Purchasing team and in this server, they cannot open SPRO-Only Transactional data can be opened

Here the testing will be done and if everything is goods then they will reply to MM consultant that everything is fine to move to production, and the same TR can be transformed to production for real time.

If there is any failure in testing, then same thing will be replied to MM consultant and another TR needs to be created with correct configuration and repeat the process up to QAC test pass.

Once the TR is released and moved to quality then we cannot use the same TR for other amendments.
If the configuration is tested and passed, then we will follow the below process.


3.Production Server

As per the above step, if everything is goods then QAC team will be informing us regarding working of configuration and once after confirmation then we will ask the BASIS team will to move the TR-Configuration from QAC to Production.
Once the Configuration moved to production then they will inform in ticket regarding confirmation then after we will inform the end user to test the configuration by processing some real data.
Once the user confirms with UAT- User acceptance test then we can close the ticket.
Note: UAT is the mandatory from User and only after that we can close the ticket.

Important Notes:

Access for Different roles in SAP Landscape:

SAP Consultant: 

SAP Consultant will be having access for all these servers.
1.     Development- where SPRO Configuration settings must be done.
2.     Quality- Having access for QAS server
3.     Production- Only Display access for production server.


SAP Super user: 

SAP Super user will be having access to 2 servers
1.     Development- No Access
2.     Quality- Having access for QAS server
3.     Production- Having access to Production server to make changes for real time data

SAP End user: 

SAP Super user will be having access to 1 server.
1.     Development- No Access
2.     Quality- No Access
3.     Production- Having access to Production server to make changes for real time data

Firefighter ID: 

Sometimes end users were not able to make changes to data or release the PR/PO and some other data.

In emergency case they can request consultant to release the data instead of them.

For this we have given access for FF ID, where we can work upon approval from manager and respective solution lead then we can process further make changes.

Service Now: 

Service now is the toll where stakeholders and consultants work on tickets.

Here each request/problem the ticket needs to be created by the requester and consultant needs to work on that based on ticket.

Time will be recorded that time of ticket handled and resolved.

Each company uses some ticketing tool to receive the tickets and each department will have respective group ID, and it will be routed to the respective persons by separate team.
Once we handle the ticket then each time ticket will be handled to the same person.

Each conversation needs to be recorded and send to tech lead for the final approval of making changes.

Here changes will be done only 2 times in a month and every change will be recorded and final approval will be taken from solution manager and 2 days in a month we will make configuration changes.

If there is a priority request then we can do in the same day with appropriate approvals from respective team lead and business justification is required from requester that why they want it as urgent and this completes the TR process.


29 comments:

  1. After reading your blog I think you have good information about transport. I would like to share this information with my friends who need this. Thanks for this blog. oracle fusion manufacturing training India

    ReplyDelete
    Replies
    1. Thank you !!!Sure, will do
      Please reach out to - Studyuuusapmm@gmail.com for queries.

      Delete
  2. Having your landscape lighting expertly introduced will open up your choices for landscape lighting more than the vast majority figure it out. Concrete and landscape companies

    ReplyDelete
  3. A mode can be utilized without anyone else or related to a few different modes; for this situation it is alluded to 'multi-purpose' or 'multimodal' transport. get a list of the best 5 movers and packers

    ReplyDelete
  4. The Industrial Revolution of the nineteenth century flipped transportation completely around.https://europa-road.eu/hu/foldmunkagep-szallitas-debrecen.php

    ReplyDelete
  5. If you travel with a disability, handicap, physical limitation, mobility limitation, or developmental disability, have special needs, or use an electric wheelchair or handicap scooter, it's a good idea to learn as much as you can to make disabled travel easier. ship radar

    ReplyDelete
  6. This comment has been removed by the author.

    ReplyDelete
  7. Wow, What a Excellent post. I really found this to much informatics. It is what i was searching for.I would like to suggest you that please keep sharing such type of info.Thanks Europa-Road túlméretes szállítás

    ReplyDelete
  8. Be certain you understand what the transport organization's protection strategies cover and the measure of protection deductible you would have to pay out in the event that there is a protection guarantee. 搬屋公司

    ReplyDelete
  9. Thanks so much for sharing this awesome info! I am looking forward to see more postsby you! O'hare

    ReplyDelete
  10. The appearance positively wonderful. All of these miniature info are fashioned utilizing massive amount historical past experience. I want it all significantly O'hare

    ReplyDelete
  11. The accompanying passage is taken from the United States Department of Labor.
    Stump Grinding Austin

    ReplyDelete
  12. It is also crucial when trees are blocking a driveway or sidewalk. Similarly, tree limbing is needed when there are too many branches hindering sunlight to pass into your house or garden. Tree Cutting Mission Viejo

    ReplyDelete
  13. Really appreciate you sharing this blog post. Really looking forward to read more. Great.removing small and big trees

    ReplyDelete
  14. The Wright siblings' effective tests with airplane prepared for planes and air transport turned into a quicker method to transport products and individuals in more diminutive time periods to additional objections. travel from denver to vail

    ReplyDelete
  15. In case you are perusing this aide, the odds are you have not shipped previously, or you are new to how the interaction functions; notwithstanding, you could be important for a stockroom team and know about a large portion of this stuff as of now. Shipping from china

    ReplyDelete
  16. I think this is an informative post and it is very beneficial and knowledgeable. Therefore, I would like to thank you for the endeavors that you have made in writing this article. All the content is absolutely well-researched. Thanks... şehirler arası nakliye

    ReplyDelete
  17. A synthetic grass lawn can offer the same lush look without the ill effects of fertilizers and pesticides. O'Neill's Green Services

    ReplyDelete
  18. When doing a landscape project it can be difficult to choose between having a landscape architect doing the design, a landscaping contractor building the project or doing it one's self. Many of the factors to consider include budget, how much money to spend, time, how long will it take to do everything, effort, how much work has to be done. Trees, flowers, shrubs and other plants have to be selected along with materials such as brick, stone, concrete and wood. Additional considerations might be weather, climate, irrigation and drainage. For routine maintenance, landscape contractors can save time doing lawn care, raking and disposing of leaves in fall. bend fence and deck

    ReplyDelete
  19. Moving home or office is as of now such a distressing encounter and the organization you pick should attempt to take the action simple and consistent, lessening the pressure and assisting you with overcoming the move that smidgen more straightforward.book man with van
    hire movers near me

    ReplyDelete
  20. To be entirely guaranteed she should likewise have three years of temporary position in a landscape structural office. The accompanying section is taken from the United States Department of Labor. selfie ideas at home

    ReplyDelete
  21. These spots are called docks and will be to some extent huge enough for a semi-trailer to crash into. Contingent upon what the products are, the docks could be a lot bigger. Europa-Road

    ReplyDelete
  22. landscape engineers should have the option to pass their thoughts on to different experts and clients and to make introductions before enormous gatherings. eCommerce Photo Editing

    ReplyDelete
  23. The roomier and greater a car is, the greater the expense. Avoid paying for space that isn't required as this will make renting much cheaper. follow for more

    ReplyDelete
  24. Transportation system doing the great job for us to moving our properties from one to another location. Here with Waage Umzüge Berlin (Scale removals), you can find the experts with services like scale removals, Disposal/clearing out, warehousing, apartment liquidation, moving helper, and so on just with a great price. visit us now!

    ReplyDelete
  25. There are many factors to consider in landscape design. Landscaping can be a do-it-yourself project or can be done by landscape professionals like landscape architects and contractors. bild zeichnen lassen

    ReplyDelete
  26. Long Distance Towing provides custom towing quotes to and from every location in the United States. When we give a quote to tow a clients car or truck we ... auto transport quotes

    ReplyDelete
  27. The lifespan of a dump truck can vary depending on factors like maintenance and usage, but they are built to withstand heavy-duty work.
    Dumpsters and Junk Hauling

    ReplyDelete
  28. Construction debris is a common type of junk removed from job sites.
    Junk Removal Laredo TX

    ReplyDelete

Featured post

What is IDOC? Explanation for Interview Purpose

What is IDOC? Explanation for Interview Purpose: Overview Explanation for Interview purpose Question: What is IDOC ? IDOC i...

Popular Posts